
The new cycle in the construction sector in Cape Verde: modernisation and formalisation
The construction sector in Cape Verde is currently experiencing a a phase of far-reaching legislative modernisation. With tourism breaking records (1.17 million visitors in 2024) and the housing shortage demanding urgent solutions, the Government implemented a series of reforms in 2024–2025 that radically change the paradigm governing building permits and property development in the archipelago.
For property developers, whether domestic or foreign, who wish to invest in Cape Verde in 2026, it is essential to understand three key aspects of this transformation: the new supplementary accommodation scheme (Decree-Law 56/2024), a revision of the Technical Building Code and the spatial planning tools arising from the National Policy on Spatial Planning and Urban Development (PNOTU).
The measure with the greatest impact on the property sector came into force on November 2024, with full implementation from May 2025: the new legal framework for the Supplementary Accommodation (AC).
| Amendment | Legal Impact | Obligation |
|---|---|---|
| Compulsory licensing | All private accommodation units (villas, flats, rooms) must be registered | Online registration with the Cape Verde Tourism Institute (ITCV) and preliminary inspection |
| Maximum length of stay | Stays of more than 90 consecutive days per guest are prohibited | It is not possible to replace a traditional tenancy with a holiday let |
| Exclusion of hotels | Properties classified as traditional tourist developments may not operate as holiday accommodation | A clear distinction between hotels and private accommodation |
| Stepped-up enforcement | Fines and closure for an unlicensed business | Immediate action is required to avoid penalties |
According to the Minister for Tourism and Transport, José Luís Sá Nogueira, the AC represents “a new business opportunity and a boost to the quality of the country’s tourism offering”, enabling the diaspora and small investors to play an active part in the tourism value chain.
Key data: With 1.17 million tourists in 2024 and a target of 1.2 million by 2026, the formalised private accommodation market is generating returns of 8–12% per year for compliant investors.
In January 2025, the Government announced the revision of the Technical Building Code (CTE), a technical regulation in force since 2012, in order to bring it into line with the country’s new urban planning and climate requirements.
The licensing of building works in Cape Verde continues to be governed by the Decree-Law No. 18/2011 of 28 February (Legal Framework for Urban Development and Construction), but is being supplemented by the instruments of the National Policy on Spatial Planning and Urban Development (PNOTU).
| Instrument | Applicability | Issuing Authority |
|---|---|---|
| Planning Permission | New build, extension, structural alterations | The relevant local council |
| Advance Notice | Maintenance/repair works without structural alterations | City Council (tacit approval) |
| Detailed Plan (DP) | Projects in specific zones or ZDTI | City Council, based on the PDM |
| Tourism Operating Licence | Traditional tourist developments | Cape Verde Tourism Institute |
PNOTU introduces innovative land-based instruments for the financing of urban development:
Cape Verde has one of the most attractive tax regimes for investment in holiday property in West Africa.
| Benefits | Condition | Advantage |
|---|---|---|
| Exemption from import duty | Import of specific construction materials and equipment | A reduction of 20–30% in the initial investment |
| Reduction in DI to 5% | Capital goods not covered by the full exemption | Residual value for miscellaneous equipment |
| 30% deduction from IRPC | Significant investment in tourism infrastructure | Significant tax optimisation |
| Stamp Duty Exemption | Financing operations | Reduction in capital costs |
For construction projects that create jobs:
For foreign investors:
PNOTU has created specific categories to facilitate investment in housing:
Failure to comply with the new rules will result in severe penalties:
| Offence | Sanction | Legal Basis |
|---|---|---|
| Construction work carried out without a licence | Fines of up to 3,000,000$00 CVE; suspension of construction work | Articles 94 and 99 of Decree-Law 18/2011 |
| Unregistered private accommodation | Fines, closure of the premises, removal of digital platforms | Decree-Law 56/2024 |
| Non-compliance with the CTE | Prohibition on occupation/suspension of building works | Technical Building Regulations |
| Tax fraud in the tourism sector | Criminal proceedings, fines > 500,000$00 CVE | General Tax Code |
Cape Verde is establishing itself as a tourism and property hub in West Africa, with a legal framework that is increasingly aligned with international best practice. The 2025–2026 reforms, particularly the Decree-Law 56/2024 and the revision of the CTE create a quality barrier which protects formal investors and penalises informality.
For well-organised property developers, this represents a first-mover advantage: the formalised short-stay accommodation market is growing by 15–20% per year, tourism is setting consecutive records, and the Government is offering significant tax incentives for projects that meet the new sustainability requirements.
S&D Consultoria supports property developers throughout the entire investment cycle: from assessing the legal viability of the site and drawing up the architectural design in accordance with the new CTE, through to obtaining municipal and tourism licences (including registration with the SGIT for Supplementary Accommodation), right through to the incorporation of the company eligible for tax incentives and the accounting management of the resulting tax obligations.
Book a strategic consultation for your property project →
Official Documentation and Links: