{"id":2997,"date":"2025-03-01T00:05:36","date_gmt":"2025-03-01T01:05:36","guid":{"rendered":"https:\/\/consultoria.cv\/obras-do-centro-de-saude-de-palmeira-concluidas\/"},"modified":"2025-03-01T00:05:36","modified_gmt":"2025-03-01T01:05:36","slug":"palmeira-health-centre-works-completed","status":"publish","type":"post","link":"https:\/\/consultoria.cv\/en\/obras-do-centro-de-saude-de-palmeira-concluidas\/","title":{"rendered":"Palmeira Health Centre Works Completed"},"content":{"rendered":"<div>\n<div class=\"xdj266r x11i5rnm xat24cr x1mh8g0r x1vvkbs x126k92a\">\n<div dir=\"auto\">\n<p data-start=\"53\" data-end=\"385\">The Minister of Health, Jorge Figueiredo, who is visiting Sal Island, announced today, February 26, that work on the Palmeira Health Centre has been completed. The process of acquiring the equipment needed to equip the centre is currently underway, with funding from Belgium.<\/p>\n<p data-start=\"387\" data-end=\"773\">During his visit to the health centre, the Minister said that there will be a discussion with the health delegate to ensure, as far as possible, that the structure is equipped with adequate human resources for its full operation. \u201cPalmeira is growing, it's now a small town and it really deserves these changes for the benefit of the population,\u201d he said.<\/p>\n<p data-start=\"775\" data-end=\"942\">In budgetary terms, the work on the Palmeira health centre is budgeted at around 1 million euros, covering both the construction work and the equipment.<\/p>\n<p data-start=\"944\" data-end=\"1209\" data-is-last-node=\"\" data-is-only-node=\"\">It should be remembered that construction work on the health centre began in 2022 and aims to strengthen the primary health care network on the island, the most touristic in the country, which is facing growing demand from the local population, emigrants and tourists.<\/p>\n<\/div>\n<\/div>\n<p>The post <a rel=\"nofollow\" href=\"https:\/\/www.governo.cv\/obras-do-centro-de-saude-de-palmeira-concluidas\/\" target=\"_blank\">Palmeira Health Centre Works Completed<\/a> appeared first on <a rel=\"nofollow\" href=\"https:\/\/www.governo.cv\/\" target=\"_blank\">Government of Cape Verde<\/a>.<\/p>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>O Ministro da Sa\u00fade, Jorge Figueiredo, que se encontra em visita \u00e0 Ilha do Sal, anunciou hoje, 26 de fevereiro, que as obras do Centro de Sa\u00fade de Palmeira est\u00e3o conclu\u00eddas. Neste momento, est\u00e1 em andamento um processo de aquisi\u00e7\u00e3o de equipamentos necess\u00e1rios para equipar a infraestrutura, com financiamento proveniente da B\u00e9lgica. Durante a sua [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_breakdance_hide_in_design_set":false,"_breakdance_tags":"","footnotes":""},"categories":[263],"tags":[264],"class_list":["post-2997","post","type-post","status-publish","format-standard","hentry","category-noticias","tag-noticias"],"_links":{"self":[{"href":"https:\/\/consultoria.cv\/en\/wp-json\/wp\/v2\/posts\/2997","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/consultoria.cv\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/consultoria.cv\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/consultoria.cv\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/consultoria.cv\/en\/wp-json\/wp\/v2\/comments?post=2997"}],"version-history":[{"count":0,"href":"https:\/\/consultoria.cv\/en\/wp-json\/wp\/v2\/posts\/2997\/revisions"}],"wp:attachment":[{"href":"https:\/\/consultoria.cv\/en\/wp-json\/wp\/v2\/media?parent=2997"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/consultoria.cv\/en\/wp-json\/wp\/v2\/categories?post=2997"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/consultoria.cv\/en\/wp-json\/wp\/v2\/tags?post=2997"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}